The Meroboh Menara Masjid Jamek Sarawak project involved the demolition of the existing tower structure at Masjid Jamek Negeri Sarawak.
The demolition works were carried out in a controlled and systematic manner, with careful consideration given to site safety, the surrounding structure and the existing conditions of the mosque.
Our team ensured that the works were executed according to the required procedures while maintaining a safe and organised working environment throughout the project.